last saturday morning my new house looked like this:
http://www.shavings.net/images/MC_Home.jpg
a slab, a pile of lumber and my ride.
Well, every night since then I have made it a habit to stop by the job
site at 3:45, to check up on my workers, and the quality of their work
but... and I also bring along a cooler packed with ice and a case or two
of BEvERages to show them the boss-man is not a _complete_ @ssh*le (I'm
my own G.C. and I'm subbing most of the labor ;-)
Well, as of 6:00 tonight she stands tall and pretty:
http://www.shavings.net/images/home.jpg
All ready for the Code Inspectors to come in and sign off on the framing
tomorrow) and then the roofers to come lay the felt and shingles,
while the masons to start the brick work, and I hang the doors and
windows. And then by next monday we are ready for the painfully slow
part of the process plumbing, electrical and HVAC subs can come in. Need
to remember to schedule them so they are not tripping over each other......
Man, I forgot how much WORK it was to G.C. your own house!
--
--
John G. in Memphis, TN Have a nice......... night.
http://www.shavings.net/images/Memphis/reflect_john.jpg