UK and Europe · Public discussion

Additional cycle spaces on FGW HSTs

Started by Duncan · · Last activity · 35 posts · 1,139 views

Thread navigation

Jump through the discussion

Go to the original post, the replies on this page, or the latest preserved contribution.

Thread details

What we know about this thread

Original section
UK and Europe
Published
30 November 2007
Last activity
14 December 2007
Original author
Duncan
Posts
35
Discussion status
Public discussion
Total views
1,139
Views / 30 days
0

The navigation and discussion metadata provide context. Posts remain in their original chronological order.

Showing posts 1–20 of 35
Posts remain in their original chronological order.

Text size
  1. New posters have appeared at FGW stations saying that from the start of
    the new timetable there is a change in the cycle arrangements for HSTs
    calling at stations with short platforms.

    Bikes will now be carried in the front power car which have been fitted
    with racks to hang 3 bikes for passengers boarding or alighting at
    stations with short platforms.

    HSTs will now have 12 bikes spaces in total assuming that access will be
    allowed to both power cars if the 6 spaces in Coach A are full.

    Duncan

  2. "Duncan" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:

    New posters have appeared at FGW stations saying that from the start of
    the new timetable there is a change in the cycle arrangements for HSTs
    calling at stations with short platforms.

    Bikes will now be carried in the front power car which have been fitted
    with racks to hang 3 bikes for passengers boarding or alighting at
    stations with short platforms.

    HSTs will now have 12 bikes spaces in total assuming that access will be
    allowed to both power cars if the 6 spaces in Coach A are full.

    Duncan

    So they occupy a tiny amount more space for bike storage in an area where
    no-one could be seated and change the spacious table seating in the
    carriages into sardines in a tin airline style seating... something tells me
    they're going on a space efficiency drive. One problem I have with the 'new'
    HSTs is that at 6' 5", there isn't enough leg room with the new seating for
    me to be comfortable and everyone scrambles for the table seats first.

    Paul

  3. Duncan said:

    HSTs will now have 12 bikes spaces in total assuming that access will be
    allowed to both power cars if the 6 spaces in Coach A are full.

    This assumption is incorrect....Coach A is the only space generally
    available for cycles. At short platforms, especially going towards
    London where the First Class coaches will usually lead, coach A will
    be off the rear end of the platform. Hence the suggested use of thye
    power car.

    Ordinarily, the power car spaces will *not* be available - hence the
    advice is always to reserve your space.

    On Dec 1, 7:54 am, "Paul Murphy" <[email hidden]>

    Quoted message said:

    So they occupy a tiny amount more space for bike storage in an area where
    no-one could be seated and change the spacious table seating in the
    carriages into sardines in a tin airline style seating... something tells me
    they're going on a space efficiency drive.

    At 6' 4" myself, I appreciate the gripe - but the DfT Government)
    wanted 30% more capacity in the cheapest way possible from this
    franchise, and all operators bidding were required to adhere. If you
    don't like it, use your vote at the next election, rather than (this
    time) blaming the hapless operator. It ain't their fault.

  4. "Chris" <[email hidden]> wrote in message
    news:[email hidden]...
    <snip>

    Quoted message said:

    On Dec 1, 7:54 am, "Paul Murphy" <[email hidden]>

    Quoted message said:

    So they occupy a tiny amount more space for bike storage in an area where
    no-one could be seated and change the spacious table seating in the
    carriages into sardines in a tin airline style seating... something tells
    me
    they're going on a space efficiency drive.

    At 6' 4" myself, I appreciate the gripe - but the DfT Government)
    wanted 30% more capacity in the cheapest way possible from this
    franchise, and all operators bidding were required to adhere. If you
    don't like it, use your vote at the next election, rather than (this
    time) blaming the hapless operator. It ain't their fault.

    I can understand them saying they wanted more capacity - pity the operator
    didn't pick up on the need and do something about it themselves...
    Otherwise there wouldn't have been need for those rail commuters to have
    their ticket strike (that was on the news) a while back. As for ways of
    getting 30 % more capacity, running trains with slightly more seats (but
    still plenty of legroom) more often would have achieved this. If freight
    trains were relegated to nightime use of the tracks through the use of
    off-peak discounted charges from the line provider - as happens in other
    countries - then this could be achieved. I see no need for passenger trains
    to be delayed by slow running freight trains up front and nor do I see the
    need for large sections of the network to be shutdown for 'engineering
    works' during the daytime hours (even if they are on Sundays etc) when they
    could perform scheduled track maintenance solely at night (like London
    Underground). I realise these later issues are outside of any passenger
    operators control but I don't believe they couldn't do anything about the
    first.

    Paul

  5. On Dec 2, 8:30 pm, "Paul Murphy" <[email hidden]>

    Quoted message said:

    I can understand them saying they wanted more capacity - pity the operator
    didn't pick up on the need and do something about it themselves...
    Otherwise there wouldn't have been need for those rail commuters to have
    their ticket strike (that was on the news) a while back. As for ways of
    getting 30 % more capacity, running trains with slightly more seats (but
    still plenty of legroom) more often would have achieved this.

    As it was a franchise commitment from the start, they had picked up on
    it before getting the franchise. The original timetable was imposed on
    them by the DfT - the only problem was that they didn't campaign to
    the DfT hard enough that they knew it wasn't going to work. But the
    DfT, as usual, thought it knew best....

    There was no more spare stock to run more trains - there still isn't.
    Not that is prohibitively priced, as the Adelante fleet is. No
    operator wants it at the price asked for it. And the DfT specified the
    number of seats in each coach. And the HSE specified theheight of each
    seat back too.

    Quoted message said:

    I realise these later issues are outside of any passenger
    operators control but I don't believe they couldn't do anything about the
    first.

    Wrong, I'm afraid.

  6. "Chris" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:

    On Dec 2, 8:30 pm, "Paul Murphy" <[email hidden]>

    Quoted message said:

    I can understand them saying they wanted more capacity - pity the
    operator
    didn't pick up on the need and do something about it themselves...
    Otherwise there wouldn't have been need for those rail commuters to have
    their ticket strike (that was on the news) a while back. As for ways of
    getting 30 % more capacity, running trains with slightly more seats (but
    still plenty of legroom) more often would have achieved this.

    As it was a franchise commitment from the start, they had picked up on
    it before getting the franchise. The original timetable was imposed on
    them by the DfT - the only problem was that they didn't campaign to
    the DfT hard enough that they knew it wasn't going to work. But the
    DfT, as usual, thought it knew best....

    There was no more spare stock to run more trains - there still isn't.
    Not that is prohibitively priced, as the Adelante fleet is. No
    operator wants it at the price asked for it. And the DfT specified the
    number of seats in each coach. And the HSE specified theheight of each
    seat back too.

    Quoted message said:

    I realise these later issues are outside of any passenger
    operators control but I don't believe they couldn't do anything about the
    first.

    Wrong, I'm afraid.

    You hit the nail on the head with your statement 'they didn't campaign to
    the DfT hard enough that they knew it wasn't going to work'. When the
    passenger strike was on in the news they had the PERFECT opportunity to
    publicise their side of things but we saw nothing. I'm sorry but when you
    have masses of passengers in an uproar about lack of seating and no fronting
    up by the company to put their side of things (and there definitely was no
    passing of blame to the govt for not allowing them to make the required
    changes) then can you see why people would think they just don't care about
    providing more seats?

    Paul

  7. On Sun, 2 Dec 2007 20:30:37 -0000 someone who may be "Paul Murphy"
    <[email hidden]> wrote this:-

    Quoted message said:

    If freight
    trains were relegated to nightime use of the tracks through the use of
    off-peak discounted charges from the line provider - as happens in other
    countries

    Which other countries?

    While some freight flows are suitable for overnight long distance
    movements, others are not. Should the latter be priced off the
    railways and onto the roads (where the extra lorries will not appeal
    to many cyclists)?

    Quoted message said:

    nor do I see the
    need for large sections of the network to be shutdown for 'engineering
    works' during the daytime hours (even if they are on Sundays etc) when they
    could perform scheduled track maintenance solely at night (like London
    Underground).

    London Underground do a variety of track maintenance during the day,
    on the sections above ground. It has many advantages, not least that
    the light is rather better.

    When major work is necessary underground lines are closed, though
    they are certainly far better at keeping trains running than the
    "main line" railway.

    --
    David Hansen, Edinburgh
    I will *always* explain revoked encryption keys, unless RIP prevents me
    http://www.opsi.gov.uk/acts/acts2000/00023--e.htm#54

  8. "Paul Murphy" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:


    "Duncan" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:

    New posters have appeared at FGW stations saying that from the start of
    the new timetable there is a change in the cycle arrangements for HSTs
    calling at stations with short platforms.

    Bikes will now be carried in the front power car which have been fitted
    with racks to hang 3 bikes for passengers boarding or alighting at
    stations with short platforms.

    HSTs will now have 12 bikes spaces in total assuming that access will be
    allowed to both power cars if the 6 spaces in Coach A are full.

    Duncan

    So they occupy a tiny amount more space for bike storage in an area where
    no-one could be seated and change the spacious table seating in the
    carriages into sardines in a tin airline style seating... something tells
    me they're going on a space efficiency drive. One problem I have with the
    'new' HSTs is that at 6' 5", there isn't enough leg room with the new
    seating for me to be comfortable and everyone scrambles for the table
    seats first.

    Bring back compartments. I was on a train in Cz, and it was brilliant.
    Opening windows to give you fresh air, compartments with 6 seats, so the
    probability of being irritated by an idiot was far far lower. Unfortunately,
    their modern trains follow our airline model in the main.

  9. [cross-post added]

    Chris said:
    Duncan said:

    HSTs will now have 12 bikes spaces in total assuming that access will be
    allowed to both power cars if the 6 spaces in Coach A are full.

    This assumption is incorrect....Coach A is the only space generally
    available for cycles. At short platforms, especially going towards
    London where the First Class coaches will usually lead, coach A will
    be off the rear end of the platform. Hence the suggested use of thye
    power car.

    I'm a bit puzzled about this.

    At Charlbury, HSTs have always stopped at the short platform. Coaches
    A, B, C, D and maybe E are on the platform - i.e. the majority of
    standard class, including the bike space. This is the case whether the
    train is heading to or from London.

    If they're going to change it so that "the front of the train" is
    always on the platform (and Charlbury is indeed listed on the poster
    about the new bike arrangement), that will mean a lot of people
    walking through the train to get off at their stop: and also that bike
    accommodation for the Cotswold Line, which is almost all short-
    platformed, is effectively reduced from six spaces (in coach A) to
    three (in the power car).

    Ok, so the increased use of HSTs will mean they're stopping at short
    platform stations that don't have stop-boards beyond the platform. But
    surely it would be better to install the stop-boards rather than this
    uncomfortable arrangement?

    Richard

  10. "Richard Fairhurst" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:

    [cross-post added]

    I'm a bit puzzled about this.

    At Charlbury, HSTs have always stopped at the short platform. Coaches
    A, B, C, D and maybe E are on the platform - i.e. the majority of
    standard class, including the bike space. This is the case whether the
    train is heading to or from London.

    If they're going to change it so that "the front of the train" is
    always on the platform (and Charlbury is indeed listed on the poster
    about the new bike arrangement), that will mean a lot of people
    walking through the train to get off at their stop: and also that bike
    accommodation for the Cotswold Line, which is almost all short-
    platformed, is effectively reduced from six spaces (in coach A) to
    three (in the power car).

    Ok, so the increased use of HSTs will mean they're stopping at short
    platform stations that don't have stop-boards beyond the platform. But
    surely it would be better to install the stop-boards rather than this
    uncomfortable arrangement?

    Is it possibly because the new improved SDO only operates between the front
    of the train and wherever the guard is?

    Paul

  11. On Dec 4, 11:23 am, "Paul Scott" <[email hidden]>

    Quoted message said:

    Is it possibly because the new improved SDO only operates between the front
    of the train and wherever the guard is?

    Sounds plausible, but if so, that's braindead beyond belief.

    Richard

  12. In article <80d4f3e3-cc97-4201-8296-
    [email hidden]>, [email hidden]
    says...

    Quoted message said:

    [cross-post added]

    Chris said:
    Duncan said:

    HSTs will now have 12 bikes spaces in total assuming that access will be
    allowed to both power cars if the 6 spaces in Coach A are full.

    This assumption is incorrect....Coach A is the only space generally
    available for cycles. At short platforms, especially going towards
    London where the First Class coaches will usually lead, coach A will
    be off the rear end of the platform. Hence the suggested use of thye
    power car.

    The leaflet adds more detail, including "unless instructed otherwise
    there are no cycle spaces available in the rear power car".

    So while generally only the spaces in Coach A will be available for
    travel between stations will full length platforms, it does add the
    possibility that the staff will allow the use of one or both power cars
    if required, depending on how generous they are feeling and how much
    time is available.

    Quoted message said:

    If they're going to change it so that "the front of the train" is
    always on the platform (and Charlbury is indeed listed on the poster
    about the new bike arrangement), that will mean a lot of people
    walking through the train to get off at their stop: and also that bike
    accommodation for the Cotswold Line, which is almost all short-
    platformed, is effectively reduced from six spaces (in coach A) to
    three (in the power car).

    The leaflet says that a maximum of 6 spaces can be reserved on HSTs to
    Bristol / Cardiff and Swansea. All other HSTs services will now only
    have 3 reservable spaces. However 6 spaces will continue to be available
    between stations with full length platforms.

    So yes this change will reduce cycle capacity at stations with short
    platforms and also reduce the reservable spaces at stations with full
    length platforms.

    Duncan

  13. In article <[email hidden]>,
    [email hidden] says...

    Quoted message said:


    "Richard Fairhurst" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:

    At Charlbury, HSTs have always stopped at the short platform. Coaches
    A, B, C, D and maybe E are on the platform - i.e. the majority of
    standard class, including the bike space. This is the case whether the
    train is heading to or from London.


    <snip>

    Quoted message said:
    Quoted message said:

    Ok, so the increased use of HSTs will mean they're stopping at short
    platform stations that don't have stop-boards beyond the platform. But
    surely it would be better to install the stop-boards rather than this
    uncomfortable arrangement?

    Is it possibly because the new improved SDO only operates between the front
    of the train and wherever the guard is?

    The SDO control panels I've seen fitted to the FGW allow three positions
    with the key: unlock all doors, unlock all doors forward of the panel
    and unlock all doors to the rear of the panel. This therefore shouldn't
    prevent the current procedure at Charlbury from continuing.

    Duncan

  14. "David Hansen" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:

    On Sun, 2 Dec 2007 20:30:37 -0000 someone who may be "Paul Murphy"
    <[email hidden]> wrote this:-

    Quoted message said:

    If freight
    trains were relegated to nightime use of the tracks through the use of
    off-peak discounted charges from the line provider - as happens in other
    countries

    Which other countries?

    Does it matter, I can think of two where almost all freight trains run at
    night - certainly nowhere near the extent of freight trains here during the
    daytime. Do you dispute other countries do this?

    Quoted message said:

    While some freight flows are suitable for overnight long distance
    movements, others are not. Should the latter be priced off the
    railways and onto the roads (where the extra lorries will not appeal
    to many cyclists)?

    To the contrary, if the tracks were available at lower costs during the
    night to freight operators, more customers may be interested in the lower
    rail freight costs which should flow on and there'd be fewer HGVs on the
    road. I'd be interested to know what percentage of unsuitable for night rail
    freight goods there are and the reasons for this. If it's concerns about
    security then can the valuable objects not be put in secured goods wagons?

    Quoted message said:
    Quoted message said:

    nor do I see the
    need for large sections of the network to be shutdown for 'engineering
    works' during the daytime hours (even if they are on Sundays etc) when
    they
    could perform scheduled track maintenance solely at night (like London
    Underground).

    London Underground do a variety of track maintenance during the day,
    on the sections above ground. It has many advantages, not least that
    the light is rather better.

    A large amount, and the majority by far is done at night to cause minimal
    network disruption. They also use portable lighting where required. For the
    sake of saving commuters disruption, I'd much rather track workers had to
    use artificial lighting and work unsociable hours.

    Paul

  15. On Tue, 4 Dec 2007 18:33:06 -0000 someone who may be "Paul Murphy"
    <[email hidden]> wrote this:-

    Quoted message said:
    Quoted message said:
    Quoted message said:

    If freight
    trains were relegated to nightime use of the tracks through the use of
    off-peak discounted charges from the line provider - as happens in other
    countries

    Which other countries?

    Does it matter, I can think of two where almost all freight trains run at
    night - certainly nowhere near the extent of freight trains here during the
    daytime.

    I note that you were unable to support your assertion.

    Quoted message said:

    Do you dispute other countries do this?

    Many/most freight trains run at night in the UK. However, that does
    not mean that you assertion is true.

    Quoted message said:

    I'd be interested to know what percentage of unsuitable for night rail
    freight goods there are and the reasons for this.

    One example is where the trains are part of a JIT system. Unless
    such things are to be left entirely to the lorry operators...

    --
    David Hansen, Edinburgh
    I will *always* explain revoked encryption keys, unless RIP prevents me
    http://www.opsi.gov.uk/acts/acts2000/00023--e.htm#54

  16. "David Hansen" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:

    On Tue, 4 Dec 2007 18:33:06 -0000 someone who may be "Paul Murphy"
    <[email hidden]> wrote this:-

    Quoted message said:
    Quoted message said:

    >If freight
    >trains were relegated to nightime use of the tracks through the use of
    >off-peak discounted charges from the line provider - as happens in other
    >countries

    Which other countries?

    Does it matter, I can think of two where almost all freight trains run at
    night - certainly nowhere near the extent of freight trains here during
    the
    daytime.

    I note that you were unable to support your assertion.

    I've not stated the countries I had in mind (yet) but that does not mean the
    situation doesn't exist.

    Quoted message said:
    Quoted message said:

    Do you dispute other countries do this?

    Many/most freight trains run at night in the UK. However, that does
    not mean that you assertion is true.

    Is that a yes or no? i.e. do you agree or disagree that there are other
    countries which run the vast majority of freight trains at night - or are
    you unsure? My assertion as well as claiming this currently happens overseas
    is to get the message into peoples minds that it's possible to do it here to
    (but not without ruffling a few feathers along the way) and it would be in
    the interests of the general population to do so here.

    Quoted message said:
    Quoted message said:

    I'd be interested to know what percentage of unsuitable for night rail
    freight goods there are and the reasons for this.

    One example is where the trains are part of a JIT system. Unless
    such things are to be left entirely to the lorry operators...

    That doesn't mean the freight is unsuitable for a night train - especially
    if it arrives at it's destination in the morning. If it's freight which is
    then, from the rail yards, delivered locally by road e.g. inwards goods to
    many factories, then it's possible the final step could take place at a time
    to suit If the manufacturer utilising a just in time system has the offer
    of cheaper freight overnight or peak day rates they would likely save money
    on transport by adjusting their schedule to accommodate. The sorts of
    freight trains I've recently seen holding up passenger trains include a
    rubbish train, cement train and a covered vehicle train going to the
    continent (although interestingly, by the time it got there, it would be
    well and truly night time - so should it be good enough for over there but
    not here). These examples were all spotted on lines that are very congested
    during the day but with loads of spare capacity at night.

    Paul

  17. On Wed, 5 Dec 2007 07:05:19 -0000 someone who may be "Paul Murphy"
    <[email hidden]> wrote this:-

    Quoted message said:
    Quoted message said:

    Many/most freight trains run at night in the UK. However, that does
    not mean that you assertion is true.

    Is that a yes or no? i.e. do you agree or disagree that there are other
    countries which run the vast majority of freight trains at night - or are
    you unsure?

    I am perfectly sure. One of these countries is England.

    Quoted message said:
    Quoted message said:

    One example is where the trains are part of a JIT system. Unless
    such things are to be left entirely to the lorry operators...

    That doesn't mean the freight is unsuitable for a night train - especially
    if it arrives at it's destination in the morning.

    I suggest that you don't know much about JIT.

    Quoted message said:

    The sorts of
    freight trains I've recently seen holding up passenger trains include a
    rubbish train,

    Around here IIRC such trains are run overnight. The loading and
    unloading is then done during the day.

    Quoted message said:

    cement train

    Presumably the cement company specify when they wish to start
    unloading the train. Having an extra train in the circuit so one
    could stand in a siding until that time would push the cost up and
    mean that the business was transferred to the roads, where the
    lorries would not improve the situation faced by cyclists.

    Quoted message said:

    and a covered vehicle train going to the
    continent (although interestingly, by the time it got there, it would be
    well and truly night time

    If it was going to Italy then my recollection is that the transit
    time is something around 22 hours and thus it will be operated at
    various times of the day on its journey.

    --
    David Hansen, Edinburgh
    I will *always* explain revoked encryption keys, unless RIP prevents me
    http://www.opsi.gov.uk/acts/acts2000/00023--e.htm#54

  18. Duncan said:

    The SDO control panels I've seen fitted to the FGW allow three positions
    with the key: unlock all doors, unlock all doors forward of the panel
    and unlock all doors to the rear of the panel. This therefore shouldn't
    prevent the current procedure at Charlbury from continuing.

    Unfortunately FGW has now confirmed that it _will_ be changing the
    procedure, and the front of the train will always be stopping on the
    platform at Charlbury. This means the First Class area on London-bound
    services.

    This also restricts Cotswold Line services to three bikes on an eight-
    carriage HST, as pretty much all the stations have short platforms.

    Madness, complete madness.

    Richard

  19. "David Hansen" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:

    On Wed, 5 Dec 2007 07:05:19 -0000 someone who may be "Paul Murphy"
    <[email hidden]> wrote this:-

    Quoted message said:
    Quoted message said:

    Many/most freight trains run at night in the UK. However, that does
    not mean that you assertion is true.

    Is that a yes or no? i.e. do you agree or disagree that there are other
    countries which run the vast majority of freight trains at night - or are
    you unsure?

    I am perfectly sure. One of these countries is England.

    I think not by the definition of vast majority I have in mind - I estimate
    over 90 %. Now you could claim that countrywide this may be the case but I'm
    certain that on the lines I travel on in the South East it's not.

    Quoted message said:
    Quoted message said:
    Quoted message said:

    One example is where the trains are part of a JIT system. Unless
    such things are to be left entirely to the lorry operators...

    That doesn't mean the freight is unsuitable for a night train - especially
    if it arrives at it's destination in the morning.

    I suggest that you don't know much about JIT.

    Because? What part of my argument is flawed in your opinion (bearing in mind
    the manufacturer would likely benifit through lower transport costs by using
    off-peak timings)? Just in time (JIT) supply chains aren't new, this was
    even included in my tertiary engineering quals (which included elements of
    production engineering) gained years ago.

    Quoted message said:
    Quoted message said:

    The sorts of
    freight trains I've recently seen holding up passenger trains include a
    rubbish train,

    Around here IIRC such trains are run overnight. The loading and
    unloading is then done during the day.

    Well I wish ALL of them were here as well but thats clearly not the case. I
    also recently spotted a smelly recycling waste train during the day
    travelling at low speed but I dont know if that delayed other trains. It
    still wasn't pleasant having it go past the station though.

    Quoted message said:
    Quoted message said:

    cement train

    Presumably the cement company specify when they wish to start
    unloading the train. Having an extra train in the circuit so one
    could stand in a siding until that time would push the cost up and
    mean that the business was transferred to the roads, where the
    lorries would not improve the situation faced by cyclists.

    You're missing the point that the company where the cement was going to
    could change their schedule to take advantage of cheaper night transport
    rates in the long term. I believe if they really insist on having the trains
    travel during the day, they should be penalised (a bit like congestion
    charging) and that penalty should be used in ways that reduce congestion for
    passenger trains.

    Quoted message said:
    Quoted message said:

    and a covered vehicle train going to the
    continent (although interestingly, by the time it got there, it would be
    well and truly night time

    If it was going to Italy then my recollection is that the transit
    time is something around 22 hours and thus it will be operated at
    various times of the day on its journey.

    No I was told Germany (although in fairness I don't know what part). I was
    curious what was in the very secure looking train (which looked like the
    wagons had to be uncoupled to open them up) so I asked one of the local
    station staff. No the train didn't contain bikes and this doesn't relate to
    bikes anymore so I fear this is off topic. It still, meant that the
    continent was getting priority for goods trains travelling at night and we
    were stuck with it's journey during day light hours.

    Paul

  20. On Thu, 6 Dec 2007 07:37:59 -0000 someone who may be "Paul Murphy"
    <[email hidden]> wrote this:-

    Quoted message said:
    Quoted message said:

    I am perfectly sure. One of these countries is England.

    I think not by the definition of vast majority I have in mind - I estimate
    over 90 %. Now you could claim that countrywide this may be the case but I'm
    certain that on the lines I travel on in the South East it's not.

    You sit up at 2am to count the freight trains in order to make your
    assertion?

    Most of South East England used to have bans on freight trains
    during peak hours. However, IIRC this was unacceptable under the
    provisions of the Tories' Railways Act and was discontinued.

    Quoted message said:
    Quoted message said:

    I suggest that you don't know much about JIT.

    Because?

    Because part of the essence of JIT is that materials arrive as they
    are needed, they are not held up, perhaps for 18 hours, for the
    convenience of the transport operator.

    Quoted message said:
    Quoted message said:

    Presumably the cement company specify when they wish to start
    unloading the train. Having an extra train in the circuit so one
    could stand in a siding until that time would push the cost up and
    mean that the business was transferred to the roads, where the
    lorries would not improve the situation faced by cyclists.

    You're missing the point that the company where the cement was going to
    could change their schedule to take advantage of cheaper night transport
    rates in the long term.

    Do you think that would outweigh the costs to the business, for
    example paying staff to work permanent nights?

    You are also assuming that the railways have a monopoly in the
    movement of bulk cement. They don't. Unless you are proposing lorry
    operators also pay time based access charges all your proposal is
    likely to do is get the business shifted onto the roads, where the
    extra lorry movements are unlikely to be good for cyclists. I have
    made this point more than once and it has yet to have a satisfactory
    reply.

    Quoted message said:

    No I was told Germany (although in fairness I don't know what part). I was
    curious what was in the very secure looking train (which looked like the
    wagons had to be uncoupled to open them up) so I asked one of the local
    station staff. No the train didn't contain bikes and this doesn't relate to
    bikes anymore so I fear this is off topic. It still, meant that the
    continent was getting priority for goods trains travelling at night and we
    were stuck with it's journey during day light hours.

    There is a television station for German railways, Bahn TV on one of
    the satellites, this puts on cab ride videos overnight. I sometimes
    wind through them at high speed and there are plenty of freight
    trains operating in Germany in daylight hours.

    --
    David Hansen, Edinburgh
    I will *always* explain revoked encryption keys, unless RIP prevents me
    http://www.opsi.gov.uk/acts/acts2000/00023--e.htm#54

Active in the last 60 minutes

Active in this thread

0 users · 0 guests ·0 bots ·0 total

No signed-in users are active right now.

No known search crawlers active right now.