Finally got the London cycling maps I requested weeks ago.
Judging by the one for my area (no. 8) they are already a year out of date; many farcilities built within the last year are missing. Now I recall speaking to Tom (unpronouncable Polish? name) of the LCC at Cycle 2003 last September; he said they had prepared the updates early in 2003 and were still waiting for TfL to publish them.
Finally got the London cycling maps I requested weeks ago.
Judging by the one for my area (no. 8) they are already a year out of date; many farcilities built within the last year are missing. Now I recall speaking to Tom (unpronouncable Polish? name) of the LCC at Cycle 2003 last September; he said they had prepared the updates early in 2003 and were still waiting for TfL to publish them.
Too right. I sent in a list of corrections well over a year ago and was told I was too late.
Which part of map 8 are you on? As far as I know the only facility put in in the Ealing part of the map is the Havelock Road contraflow. Excitement round Grand Union Village is yet to come.
Colin McKenzie -- The great advantage of not trusting statistics is that it leaves you free to believe the damned lies instead!
"Colin McKenzie" <[email hidden]> wrote in message news:[email hidden]...
Quoted message said:
Orienteer said:
Finally got the London cycling maps I requested weeks ago.
Judging by the one for my area (no. 8) they are already a year out of
date;
Quoted message said:
Quoted message said:
many farcilities built within the last year are missing. Now I recall speaking to Tom (unpronouncable Polish? name) of the LCC at Cycle 2003
last
Quoted message said:
Quoted message said:
September; he said they had prepared the updates early in 2003 and were still waiting for TfL to publish them.
Too right. I sent in a list of corrections well over a year ago and was told I was too late.
Which part of map 8 are you on? As far as I know the only facility put in in the Ealing part of the map is the Havelock Road contraflow. Excitement round Grand Union Village is yet to come.
Colin McKenzie --
Uxbridge. A large feature missing from the map is: a TfL-funded cycle path from Ruislip through Ickenham! Construction started well over a year ago and was the subject of much local debate.