UK and Europe · Public discussion

Bristol 2 Bath petition.

Started by Martin Dann · · Last activity · 4 posts · 615 views

This thread is locked and is currently read-only.

Thread details

What we know about this thread

Original section
UK and Europe
Published
25 January 2008
Last activity
26 January 2008
Original author
Martin Dann
Posts
4
Discussion status
Public discussion
Total views
615
Views / 30 days
0

The navigation and discussion metadata provide context. Posts remain in their original chronological order.

Showing posts 1–4 of 4
Posts remain in their original chronological order.

Text size
  1. There is an online petition against the idea of putting buses on the B2B
    path. (currently more that 2280 sigs).

    http://epetitions.bristol.gov.uk/signatures.php?id=161

    Martin.

  2. "Martin Dann" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:

    There is an online petition against the idea of putting buses on the B2B
    path. (currently more that 2280 sigs).

    http://epetitions.bristol.gov.uk/signatures.php?id=161

    Martin.

    The bit in the text that says "This bus route will take most of the width of
    the already narrow path; leaving only a 3 metre strip for cycles, walkers,
    dogs, children and disabled buggies to share." Where is the 3 metre figure
    coming from? And isn't that about how wide it is currently?

  3. Just Visiting said:

    "Martin Dann" <[email hidden]> wrote in message
    news:[email hidden]...

    Quoted message said:

    There is an online petition against the idea of putting buses on the B2B
    path. (currently more that 2280 sigs).

    http://epetitions.bristol.gov.uk/signatures.php?id=161

    Martin.

    The bit in the text that says "This bus route will take most of the width of
    the already narrow path; leaving only a 3 metre strip for cycles, walkers,
    dogs, children and disabled buggies to share." Where is the 3 metre figure
    coming from? And isn't that about how wide it is currently?

    90% of the current path is approx. a 3 metre wide strip, with trees and
    foliage on both sides. IMHO They could fit a bus route down here leaving
    room for a cycle path, but it would be just concrete and tarmac.
    Completely ruining the path, and the green corridor. A look at the path
    on google maps shows a green line where the path is.

    The line of trees runnning bottom left, to top right shows the path.

    http://maps.google.co.uk/maps?ql=&ie=UTF8&ll=51.475583,-2.537037&spn=0.003141,0.007296&t=h&z=17&om=0

    There are however several section where there simply would not be enough
    room for both a single-directional bus route and cycle path.

  4. Anybody on here who is on Facebook might be interested to note that
    there is a group on this subject!

    Martin Dann said:

    There is an online petition against the idea of putting buses on the B2B
    path. (currently more that 2280 sigs).

    http://epetitions.bristol.gov.uk/signatures.php?id=161

    Martin.

Active in the last 60 minutes

Active in this thread

0 users · 0 guests ·0 bots ·0 total

No signed-in users are active right now.

No known search crawlers active right now.