Australia and New Zealand · Public discussion

PER: Things getting done

Started by Beavers · · Last activity · 6 posts · 471 views

This thread is locked and is currently read-only.

Thread navigation

Jump through the discussion

Go to the original post, the replies on this page, or the latest preserved contribution.

Thread details

What we know about this thread

Original section
Australia and New Zealand
Published
20 August 2006
Last activity
21 August 2006
Original author
Beavers
Posts
6
Discussion status
Public discussion
Total views
471
Views / 30 days
0

The navigation and discussion metadata provide context. Posts remain in their original chronological order.

Showing posts 1–6 of 6
Posts remain in their original chronological order.

Text size
  1. A few weeks ago I crashed while crossing railway lines in Bassendean. The
    lines in question go from the main Perth-Guildford line across Railway
    Parade to the Railway Museum, so instead of going straight across the road
    they are curving away to the right. The bitumen was quite bumpy, it was a
    wet afternoon (one of the few we have had), and I was going at a reasonable
    speed, so everything went together for a crash. Just a deep graze on one
    elbow and a sound blow to the helmet, otherwise OK.

    I emailed Bassendean Council pointing out how rough the road surface was and
    mentioning that Railway Parade is a designated cycle route complete with
    lines either side of the road, in preference to Guildford Road on the other
    side of the line. A couple of days later I received a letter telling me the
    siding was the responsibility of the Museum and they would pass the message
    on.

    Last Thursday while driving home along that road, I encountered roadworks at
    the crossing, and I could see they were relaying the tarmac. Friday I was
    able to ride to work, and both ways appreciated the much smoother crossing.
    I have no idea who did the work - Council or Museum - but it seems to be
    more than a coincidence.

    More recently cycling along Mounts Bay Road past the Convention Centre, I
    realised that the road surface had been taken up and relaid, but with all
    kinds of longitudinal grooves that were a real hazard to my cycle tyres.
    Again I sent an email, this time to Perth City Council. Last week I noticed
    that things seemed rather better, and tonight when looking at emails for the
    first time since Tuesday, I've found one from PCC telling me my request has
    been investigated and necessary repair works have been carried out.

    So it's nice to know that people up there are listening. And now I also know
    about the web page for reporting a cycling hazard
    (http://www.dpi.wa.gov.au/cycling/2345.asp) which a mate told me about
    yesterday. This means that things got done even without using the correct
    form - not very Public Service!

    Cheers
    Beavers

  2. Beavers said:

    So it's nice to know that people up there are listening. And now I also know
    about the web page for reporting a cycling hazard
    (http://www.dpi.wa.gov.au/cycling/2345.asp) which a mate told me about
    yesterday. This means that things got done even without using the correct
    form - not very Public Service!

    Nicely done. I didn't know about that form, but I've got it bookmarked
    now. I submitted a complaint about a traffic light that doesn't sense
    bicycles already, hopefully that will be fixed.

    Travis

  3. Beavers said:

    A few weeks ago I crashed while crossing railway lines in Bassendean. The
    lines in question go from the main Perth-Guildford line across Railway
    Parade to the Railway Museum, so instead of going straight across the road
    they are curving away to the right. The bitumen was quite bumpy, it was a
    wet afternoon (one of the few we have had), and I was going at a reasonable
    speed, so everything went together for a crash. Just a deep graze on one
    elbow and a sound blow to the helmet, otherwise OK.

    I emailed Bassendean Council pointing out how rough the road surface was and
    mentioning that Railway Parade is a designated cycle route complete with
    lines either side of the road, in preference to Guildford Road on the other
    side of the line. A couple of days later I received a letter telling me the
    siding was the responsibility of the Museum and they would pass the message
    on.

    Last Thursday while driving home along that road, I encountered roadworks at
    the crossing, and I could see they were relaying the tarmac. Friday I was
    able to ride to work, and both ways appreciated the much smoother crossing.
    I have no idea who did the work - Council or Museum - but it seems to be
    more than a coincidence.

    More recently cycling along Mounts Bay Road past the Convention Centre, I
    realised that the road surface had been taken up and relaid, but with all
    kinds of longitudinal grooves that were a real hazard to my cycle tyres.
    Again I sent an email, this time to Perth City Council. Last week I noticed
    that things seemed rather better, and tonight when looking at emails for the
    first time since Tuesday, I've found one from PCC telling me my request has
    been investigated and necessary repair works have been carried out.

    So it's nice to know that people up there are listening. And now I also know
    about the web page for reporting a cycling hazard
    (http://www.dpi.wa.gov.au/cycling/2345.asp) which a mate told me about
    yesterday. This means that things got done even without using the correct
    form - not very Public Service!

    Cheers
    Beavers

    I live in a country town in WA and when I've complained to the council
    about railway crossings I get told that it's the railway owners
    responsibility and the council won't touch it.

    Friday

  4. Beavers said:

    A few weeks ago I crashed while crossing railway lines in Bassendean. The
    lines in question go from the main Perth-Guildford line across Railway
    Parade to the Railway Museum, so instead of going straight across the road
    they are curving away to the right. The bitumen was quite bumpy, it was a
    wet afternoon (one of the few we have had), and I was going at a reasonable
    speed, so everything went together for a crash. Just a deep graze on one
    elbow and a sound blow to the helmet, otherwise OK.

    I emailed Bassendean Council pointing out how rough the road surface was and
    mentioning that Railway Parade is a designated cycle route complete with
    lines either side of the road, in preference to Guildford Road on the other
    side of the line. A couple of days later I received a letter telling me the
    siding was the responsibility of the Museum and they would pass the message
    on.

    Last Thursday while driving home along that road, I encountered roadworks at
    the crossing, and I could see they were relaying the tarmac. Friday I was
    able to ride to work, and both ways appreciated the much smoother crossing.
    I have no idea who did the work - Council or Museum - but it seems to be
    more than a coincidence.

    More recently cycling along Mounts Bay Road past the Convention Centre, I
    realised that the road surface had been taken up and relaid, but with all
    kinds of longitudinal grooves that were a real hazard to my cycle tyres.
    Again I sent an email, this time to Perth City Council. Last week I noticed
    that things seemed rather better, and tonight when looking at emails for the
    first time since Tuesday, I've found one from PCC telling me my request has
    been investigated and necessary repair works have been carried out.

    So it's nice to know that people up there are listening. And now I also know
    about the web page for reporting a cycling hazard
    (http://www.dpi.wa.gov.au/cycling/2345.asp) which a mate told me about
    yesterday. This means that things got done even without using the correct
    form - not very Public Service!

    Cheers
    Beavers

    My experience with using the hazerd report form is so uncannily
    positive that I am now loath to use it for quibbles. I have a three
    for three strike rate, and I was so impressed I "wrote a letter" to the
    Cycling Branch of DPI.
    Snail mail.

    I think it pays to give positive feedback in the hope it will reinforce
    their prompt attention to detail.

    Try a direct letter to Alannah MacTiernan's Ministerial office with a
    CC to Martin Whitely [email hidden] Member for Bassendean. DPI
    pride themselves on being deal makers with various agencies, so rather
    than getting buck passing when you go through channels, go over their
    heads and become a squeaky wheel. The designated cycle route through
    Bassendean is unsafe and should be fixed.

    I know exactly the stretch of road, I used it for my commute to uni
    from Guildford for my undergraduate. Depending on traffic I would try
    to swerve out to get te crossing angle close to 90 degrees, but this
    means leaving the cycle lane and jousting with the cars that invariably
    speed along Railway Parade.

    I am a member of the Bicycling Transport Alliance perhaps we / I could
    write a letter in support? Let me know

  5. Travis said:
    Beavers said:

    So it's nice to know that people up there are listening. And now I also know
    about the web page for reporting a cycling hazard
    (http://www.dpi.wa.gov.au/cycling/2345.asp) which a mate told me about
    yesterday. This means that things got done even without using the correct
    form - not very Public Service!

    Nicely done. I didn't know about that form, but I've got it bookmarked
    now. I submitted a complaint about a traffic light that doesn't sense
    bicycles already, hopefully that will be fixed.

    And today I got a call asking for clarification of the problem, he took
    down my report and said he'd booked a contractor to go turn up the
    sensitivity on the bike sensor.

    I'm impressed, the system works!

    Travis

  6. Beavers said:

    A few weeks ago I crashed while crossing railway lines in Bassendean. The
    lines in question go from the main Perth-Guildford line across Railway
    Parade to the Railway Museum, so instead of going straight across the road
    they are curving away to the right. The bitumen was quite bumpy, it was a
    wet afternoon (one of the few we have had), and I was going at a reasonable
    speed, so everything went together for a crash. Just a deep graze on one
    elbow and a sound blow to the helmet, otherwise OK.

    I emailed Bassendean Council pointing out how rough the road surface was and
    mentioning that Railway Parade is a designated cycle route complete with
    lines either side of the road, in preference to Guildford Road on the other
    side of the line. A couple of days later I received a letter telling me the
    siding was the responsibility of the Museum and they would pass the message
    on.

    Last Thursday while driving home along that road, I encountered roadworks at
    the crossing, and I could see they were relaying the tarmac. Friday I was
    able to ride to work, and both ways appreciated the much smoother crossing.
    I have no idea who did the work - Council or Museum - but it seems to be
    more than a coincidence.

    More recently cycling along Mounts Bay Road past the Convention Centre, I
    realised that the road surface had been taken up and relaid, but with all
    kinds of longitudinal grooves that were a real hazard to my cycle tyres.
    Again I sent an email, this time to Perth City Council. Last week I noticed
    that things seemed rather better, and tonight when looking at emails for the
    first time since Tuesday, I've found one from PCC telling me my request has
    been investigated and necessary repair works have been carried out.

    So it's nice to know that people up there are listening. And now I also know
    about the web page for reporting a cycling hazard
    (http://www.dpi.wa.gov.au/cycling/2345.asp) which a mate told me about
    yesterday. This means that things got done even without using the correct
    form - not very Public Service!

    Cheers
    Beavers

    I just re-read your post and I was obviously in a caffeine deficit when
    i wrote my first response. They improved the roadways as a result of
    your comment.

    Please let them know how much you appreciate the service, a letter
    makes a big difference, and we dont want you losing more bark, do we?

Active in the last 60 minutes

Active in this thread

0 users · 0 guests ·0 bots ·0 total

No signed-in users are active right now.

No known search crawlers active right now.