JitensyaJim said:Thanks. Glad it's not just me. What do you mean by decoder ring?
I mean an answer to your question. It came up before, but I'm not sure in which thread. I seem to recall that there was an answer.
JitensyaJim said:What I initially wanted to do was to compare, for example, a curve for this month with one from last month, on the same graph. Doesn't seem possible with CP as it is, so I thought I could get the raw numbers out and plot them myself. Do you have a better way of doing things like this?
Well, if what you want to do is compare the same chart for two different time periods, you can clone the chart and change the dates. Likewise, if you want to compare the same chart on an AP vs. NP basis, you can put the charts side by side. If you want to extrapolate the data and do something with it outside of CP (e.g., in Excel), I'm not sure how to get the duplicate data.
I don't use those charts much unless I want to cherry pick a couple of values, in which case I just use the CP chart as is. My needs outside of CP relate to ride file parsing by training level, for which I have written my own program to act on the raw ride files. My other ex-CP need is the Critical Power Curve and again I just use a few selected numbers which I copy manually. So, I almost never need to use the Copy Raw function for the charts.