Cycling Equipment · Public discussion

Problem with aligning Time Impact cleats on Sidi shoes

Started by elricko · · Last activity · 4 posts · 1,475 views

Thread details

What we know about this thread

Original section
Cycling Equipment
Published
2 August 2005
Last activity
27 February 2006
Original author
elricko
Posts
4
Discussion status
Public discussion
Total views
1,475
Views / 30 days
0

The navigation and discussion metadata provide context. Posts remain in their original chronological order.

Showing posts 1–4 of 4
Posts remain in their original chronological order.

Text size
  1. Hi all,

    Having an issue here.

    I have a pair of Sidi Genius 3 shoes, which I have been normally using Look cleats.

    Have been trying the time impact pedals, but I am having major difficulty getting the ball of my foot lined up correctly.

    The shoes have the look adapter plate, and I just cannot get the ball of my foot lined up - the cleat does not have the range of movement (where the screws line up).

    I am sure that I am doing something REALLY stupid.

    Any ideas/thoughts?

    Thanks in advance

  2. I actually found the same problem. I found I could not "rotate" the Time Impact cleat as much as Look cleats allowed. For the most part, the Impacts were still great for me, but after a while it started to bother me a bit. To fix my issues, I bought a set of Look Keo's--no problems since then.

  3. I have the same set up , Genius 3 / Impact Mag.

    I did not find the aligning of the cleat-plate with the shoe a problem , but in using the pedals the first few times, it was a definite change from going from my Time Mag. Equipe Pro's... 2001 pedals . I believe the Impacts have a bit less contact surface... so thats what was getting to me.

    Hope everything works out for you. 😉

  4. I'm looking at SIDI shoes, however I also want a shoe with 4-hole mounting. I'm sick of the 3-hole to 4-hole conversion brackets. The Sidi site isn't very informative (photos, descriptions, etc) about which shoes do have 4-hole mountings. Can anyone help? Lists, etc?

    Would be very grateful. 🙂 Might even send you my old shoes! 🙂

Active in the last 60 minutes

Active in this thread

0 users · 0 guests ·0 bots ·0 total

No signed-in users are active right now.

No known search crawlers active right now.