These are the first generation after TIME replaced the Equipe. These pedals have a magnesium alloy body with a cro-mo spindle. More information at this Cycling News link (link is to a description of the Ti model, this is not the Ti model, but design and pedal body are the same)
I used these for 1.5 seasons, the mag bodies have lost some paint and have some scratches, but never down. I replaced the bearings shortly before I upgraded to the Titan pedals, so they're smooth. $35 + shipping, Paypal or Money order only. First response gets 'em.